  • Developing the national wind energy road map.
  • Design and setting up a wind turbine testing center.
  • Design and construction of national 2MW wind turbine.
  • Technical and economic feasibility study on construction of wind turbine research and testing centers in Iran and preliminary design of a suitable test center.
  • Feasibility study on wind power and to determine the possible usage of wind energy; in the Northwest of Iran.
  • Design and know‐how development of wind turbines up to one megawatt and documentation of a 25 kw wind turbine.
  • Preliminary studies and conceptual design of national megawatt wind turbine.
  • Design and constructing of a 5 kw wind turbine. (WENRI‐5)
  • Wind energy research and development.